You are a project manager who is taking over a struggling project

In this task, you will practice monitoring and controlling for one project you select from one of two case studies.
SCENARIO
You are a project manager who is taking over a struggling project. Two projects are at risk of being cancelled by their clients due to a variety of issues. Read the attached “Case Study 5” and “Case Study 6,” and use one of the two case studies when monitoring and controlling a project.
REQUIREMENTS
Your submission must be your original work. No more than a combined total of 30% of the submission and no more than a 10% match to any one individual source can be directly quoted or closely paraphrased from sources, even if cited correctly. The originality report that is provided when you submit your task can be used as a guide.

 

You must use the rubric to direct the creation of your submission because it provides detailed criteria that will be used to evaluate your work. Each requirement below may be evaluated by more than one rubric aspect. The rubric aspect titles may contain hyperlinks to relevant portions of the course.

 

 

 

Complete the attached “Monitoring and Controlling Template” by doing the following:

 

 

 

A. Document five new risks for the chosen case study is currently facing by completing the table in the “Risk Assessment” section of the attached “Monitoring and Controlling Template.” The risk assessment needs to include a risk description, the likelihood of the risk occurring, the impact of the risk, the person responsible for mitigating the risk, and a prevention and mitigation strategy for the risk.

 

 

 

B. Create a Gantt chart showing the projected timeline and critical path for the chosen case study in the “Gantt Chart” section of the attached “Monitoring and Controlling Template.”

 

 

 

C. Provide a completed “Earned Value Analysis” section and a completed “Earned Value Projections” section for the chosen case study in the attached “Monitoring and Controlling Template” by completing the tables in those sections and doing the following:

 

1. Analyze the current schedule and budget performance of each project workgroup.

 

2. Estimate the expected completion date and total cost of the project workgroups.

 

3. Interpret the workgroup analysis and project schedule and cost estimates.

 

 

 

D. Provide a completed “Burndown Chart” section for the chosen case study in the attached “Monitoring and Controlling Template” by doing the following:

 

1. Create a burndown chart.

 

2. Analyze the team’s overall progress in the “Discussion of Burndown Chart” section of the attached “Monitoring and Controlling Template,” using the burndown chart from part D1.

 

 

 

E. Explain how three mitigation strategies could have a positive impact on the schedule and budget performance of the project team for the chosen case study in the “Mitigation Plan” section of the attached “Monitoring and Controlling Template.”

 

 

 

F. Acknowledge sources, using in-text citations and references, for content that is quoted, paraphrased, or summarized.

 

 

 

G. Demonstrate professional communication in the content and presentation of your submission.

Calculate the price of your order

550 words
We'll send you the first draft for approval by September 11, 2018 at 10:52 AM
Total price:
$26
The price is based on these factors:
Academic level
Number of pages
Urgency
Basic features
  • Free title page and bibliography
  • Unlimited revisions
  • Plagiarism-free guarantee
  • Money-back guarantee
  • 24/7 support
On-demand options
  • Writer’s samples
  • Part-by-part delivery
  • Overnight delivery
  • Copies of used sources
  • Expert Proofreading
Paper format
  • 275 words per page
  • 12 pt Arial/Times New Roman
  • Double line spacing
  • Any citation style (APA, MLA, Chicago/Turabian, Harvard)

Our guarantees

Delivering a high-quality product at a reasonable price is not enough anymore.
That’s why we have developed 5 beneficial guarantees that will make your experience with our service enjoyable, easy, and safe.

Money-back guarantee

You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.

Read more

Zero-plagiarism guarantee

Each paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.

Read more

Free-revision policy

Thanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.

Read more

Privacy policy

Your email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.

Read more

Fair-cooperation guarantee

By sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.

Read more
error: Content is protected !!