Pre-Evaluation of Projects There is a potential commercial rooftop solar PV project which needs to have a financial analysis done as part of a pre-feasibility study conducted. i)

Pre-Evaluation of Projects

There is a potential commercial rooftop solar PV project which needs to have a financial analysis done as part of a pre-feasibility study conducted.

i) The designed capacity is estimated to be 600 kWp, with annual PV production of 735,840 kWh (or Capacity Factor of 14%).

ii) Degradation rate of the solar PV production assumed to be 0.5% per annum

iii) An EPC has provided a prelim turnkey quotation at USD 0.65/Watt peak.

iv) O&M assumed by default to be 1% of Capex per annum, with 1% annual inflation v) Equipment(including inverter) replacement can be assumed to be $0.10 per Watt peak

v) The prospect’s current electricity tariff is about USD 0.07/kWh.

vii) Any suitable USD to IDR exchange rate can be assumed

The prospect is interested in an offer of a PPA contract and the sales team requests both a 20 and 25 year option for contract duration. Given that the benchmark IRR for most investors is 12%;

a) Based on the sales team suggestion of going with a 20% discount off tariff(D.O.T) for 20 years and 25% discount off tariff for 25 years, determine if the project is financially feasible for

i) Genes as the developer without any external project investors

ii) Project Investors if they were to come in with 100% of the CapEx needed, while GENES will earn

as a % of the Net Project Cashflow

If the above suggestion by the sales team is deemed to be financially unfeasible,

b) Suggest to the sales team what will be the suitable discount off tariff(D.O.T) that can be offered to the clients for both 20 and 25 years contract duration, if

i) Genes as the developer without any external project investors

ii) Project Investors if they were to come in with 100% of the CapEx needed, while GENES will

earn as a % of the Net Project Cashflow

c)  After prospect has agreed to the offered discount off tariff based on 1st round of discussions,

how would you further verify the feasibility of the project?

Hint: Think of at least 2 variables that can quite significantly affect the outcome from the pre-feasibility study in part a) and/or part b)?

Calculate the price of your order

550 words
We'll send you the first draft for approval by September 11, 2018 at 10:52 AM
Total price:
$26
The price is based on these factors:
Academic level
Number of pages
Urgency
Basic features
  • Free title page and bibliography
  • Unlimited revisions
  • Plagiarism-free guarantee
  • Money-back guarantee
  • 24/7 support
On-demand options
  • Writer’s samples
  • Part-by-part delivery
  • Overnight delivery
  • Copies of used sources
  • Expert Proofreading
Paper format
  • 275 words per page
  • 12 pt Arial/Times New Roman
  • Double line spacing
  • Any citation style (APA, MLA, Chicago/Turabian, Harvard)

Our guarantees

Delivering a high-quality product at a reasonable price is not enough anymore.
That’s why we have developed 5 beneficial guarantees that will make your experience with our service enjoyable, easy, and safe.

Money-back guarantee

You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.

Read more

Zero-plagiarism guarantee

Each paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.

Read more

Free-revision policy

Thanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.

Read more

Privacy policy

Your email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.

Read more

Fair-cooperation guarantee

By sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.

Read more
error: Content is protected !!