Thumb rule

Thumb rule for estimating the Concrete Volume with respect to the area:

The volume of concrete required = 0.038 m3/m2

 

Thumb rule for Steel quantity required for Slab, Beams, Footings & Columns:

Steel required in residential buildings = 4.5 Kgs – 4.75 Kgs / Sq. Ft.

Steel required For Commercial buildings = 5.0 Kgs-5.50 Kgs/Sq. Ft.

 

    Percentage of Steel in Structural Members:

1) Slab – 1% of the total volume of concrete
2) Beam – 2% of the total volume of concrete
3) Column – 2.5% of total volume of concrete
4) Footings – 0.8% of the total volume of concrete

Thumb Rules For Civil Engineers to estimate the Shuttering area:

Shuttering costs is taken as 15-18% of the total construction of the building. Shuttering work is done to bring the concrete in Shape. Thumb rule to estimate the shuttering required is 6 times the quantity of concrete or 2.4 times of Plinth area.

The No. of Shuttering Ply sheets = 0.22 times of Shuttering

Suppose, the shuttering area = 3m

Then Ply required for shuttering = 0.22 x 3 = 0.66m2

Battens Quantity Calculation:

Shuttering batten usually has a length & width of 75mm x 40mm.

Batten Quantity = 19.82 x No. of Ply Sheets

If work requires 25 Ply sheets, the total quantity of Battens are 19.82 x 25 = 495 Battens

 

Nails & Binding Wire Quantity in Shuttering:

Approximately, 75 gams of Nails used in the shuttering of the 1m2 area.

75gms of Binding wire is used for every 1m2 of Shuttering.

Thumb rule for Shuttering oil estimation :

Shuttering oil is applied on the shuttering plate surface used to de-frame or de-assemble from the concrete easily.

Total required Shuttering oil  = 0.065 x Total Area of Shuttering

(or)

For every 15m2 of shuttering 1 liter of shuttering oil is consumed.

 

 

 

 

Thumb rule used for Cement, Sand, Coarse Aggregate Quantity in Different grades of Concrete:

Thumb Rules For Civil Engineers for Brickwork:

Brickwork for 1m3 Cement Qty in m3 Cement Qty in Bags
230 mm Brickwork 0.876m3 25.4 Bags
115 mm Brickwork 0.218m3 6.32 Bags

Thumb Rules For Civil Engineers for Cement Masonry Quantity:

Cement Masonry Type & Mix Cement Qty in Bags Cement Qty in Kgs
200mm in Cement Masonry work
of ratio 1:6
0.124Bags/m2 6.2Kgs/m2
150mm in Cement Masonry work
of ratio 1:6
0.093Bags/m2 4.65Kgs/m2
200mm in Cement Masonry work
of ratio 1:4
0.206Bags/m2 10.3Kgs/m2
150mm in Cement Masonry work
of ratio 1:4
0.144Bags/m2 7.2Kgs/m2
100mm in Cement Masonry work
of ratio 1:4
0.103Bags/m2 5.15Kgs/m2

Thumb Rules Plastering Quantity :

Type of Plastering Cement Qty in Bags Cement Qty in Kgs
Rough Plastering 0.09 Bags/m2 4. 5Kgs/m2
Internal Wall Plastering 0.09 Bags/m2 4.5 Kgs/m2
Duct Plastering 0.09 Bags/m2 4.5 Kgs/m2
External Wall plastering 0.175 Bags/m2 8.75 Kgs/m2
Stucco Plastering 0.175 Bags/m2 8.75 Kgs/m2
Lathen Plastering 0.55 Bags/m2 27.5 Kgs/m2

Calculate the price of your order

550 words
We'll send you the first draft for approval by September 11, 2018 at 10:52 AM
Total price:
$26
The price is based on these factors:
Academic level
Number of pages
Urgency
Basic features
  • Free title page and bibliography
  • Unlimited revisions
  • Plagiarism-free guarantee
  • Money-back guarantee
  • 24/7 support
On-demand options
  • Writer’s samples
  • Part-by-part delivery
  • Overnight delivery
  • Copies of used sources
  • Expert Proofreading
Paper format
  • 275 words per page
  • 12 pt Arial/Times New Roman
  • Double line spacing
  • Any citation style (APA, MLA, Chicago/Turabian, Harvard)

Our guarantees

Delivering a high-quality product at a reasonable price is not enough anymore.
That’s why we have developed 5 beneficial guarantees that will make your experience with our service enjoyable, easy, and safe.

Money-back guarantee

You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.

Read more

Zero-plagiarism guarantee

Each paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.

Read more

Free-revision policy

Thanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.

Read more

Privacy policy

Your email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.

Read more

Fair-cooperation guarantee

By sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.

Read more
error: Content is protected !!