In a steam-power plant, steam at 200 psia and 600 ° F enters a turbine and exits at 5 psia and 200 ° F

P6.1 In a steam-power plant, steam at 200 psia and 600 ° F enters a turbine and exits at 5 psia and 200 ° F. The steam enters the turbine through a 2.5-inchdiamateter pipe with a velocity of 11 ft/s and exits through a 9-inch-diamater.
Find the power in kW produced by turbine.
Chapter 6 Problem 11 A hot exhaust gas is heating a boiler to produce superheated steam at 100 psia and 400 ° F. In the meantime, the exhaust gas is cooled from 2500 to 350 ° F. Saturated liquid water (stream 1) at 14.7 psia enters the boiler with a flow rate of 200 lb/h. Superheated steam (stream 2) is used in a turbine, and discharged as saturated steam (stream 3) at 14.7 psia. Assume that the surroundings are at 70 ° F, and the heat capacity of the flue gas is C p =7.606 +0.0006077 T , where T is in Rankine and C p is in Btu/(lbmol R).
Determine the molar flow rate in mol/s of the exhaust gas needed and the maximum work produced in kJ/s.
P6.19 A steady flow adiabatic turbine receives steam at 650 K and 8200 kPa, and discharges it at 373.15 K and 101.32 kPa. If the flow rate of the steam is 12 kg/sdetermine
(a) The maximum work in kJ/s and
(b) The work loss in kJ/s if the surroundings are at 298.15 K.
P6.35 A steam power plant is using a geothermal energy source. The geothermal source is available at 220 ° C and 2320 kPa with a flow rate of 50 kg/s. The hot water goes through a valve and a flash drum. Steam from the flash drum enters the turbine at 550 kPa and 428.62 K. The discharged steam from the turbine has a quality of x 4 = 0.90. The condenser operates at 15 kPa. The water is a saturated liquid after passing through the condenser.
Determine the net work output in kW.
Chapter 6 Problem 42 In a hydropower plant, a hydroturbine operates with a head of 33 m of water. Inlet and outlet conduits are 1.70 m in diameter. If the outlet velocity of the water is 4.6 m/s
estimate the power produced by the turbine in kJ/s.
Chapter 6 Problem 46 A farm of windmills supplies a power output of 2 MW for a community. Each windmill has blades 10 m in diameter. At the location of the windmills, the average velocity of the wind is 11 m/s and the average temperature is 20 ° C.
Estimate the minimum number of windmills to be installed.

Calculate the price of your order

550 words
We'll send you the first draft for approval by September 11, 2018 at 10:52 AM
Total price:
$26
The price is based on these factors:
Academic level
Number of pages
Urgency
Basic features
  • Free title page and bibliography
  • Unlimited revisions
  • Plagiarism-free guarantee
  • Money-back guarantee
  • 24/7 support
On-demand options
  • Writer’s samples
  • Part-by-part delivery
  • Overnight delivery
  • Copies of used sources
  • Expert Proofreading
Paper format
  • 275 words per page
  • 12 pt Arial/Times New Roman
  • Double line spacing
  • Any citation style (APA, MLA, Chicago/Turabian, Harvard)

Our guarantees

Delivering a high-quality product at a reasonable price is not enough anymore.
That’s why we have developed 5 beneficial guarantees that will make your experience with our service enjoyable, easy, and safe.

Money-back guarantee

You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.

Read more

Zero-plagiarism guarantee

Each paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.

Read more

Free-revision policy

Thanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.

Read more

Privacy policy

Your email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.

Read more

Fair-cooperation guarantee

By sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.

Read more
error: Content is protected !!